46 |
Sep 2019 |
ATIN Ferrosilicon and Magnesium |
25,000 tpy FeSi75% Production Plant |
Key Equipment Supply |
45 |
Sep 2019 |
ATIN Ferrosilicon and Magnesium |
25,000 tpy FeSi75% Production Plant |
Basic & Detailed Engineering Services, Supervisory Services, Training, Purchasing management |
44 |
Jun 2019 |
Sanaie Alloy Nahavand Silice |
5,000 tpy FeSi75% Production Plant |
Key Equipment Supply |
43 |
Jun 2019 |
Sanaie Alloy Nahavand Silice |
5,000 tpy FeSi75% Production Plant |
Basic & Detailed Engineering Services, Supervisory Services, Consulting |
42 |
May 2017 |
Poyan Gohar Kariman |
12,000 tpy FeSi75% Production Plant |
Basic & Detailed Engineering Services, Supervisory Services |
41 |
Oct 2016 |
Asia Steel Metallurgy Ind. |
15,000 tpy FeMn Production Plant |
Basic & Detailed Engineering of Landscaping Services |
40 |
Sep 2015 |
Foolad Sang Mining and Industrial |
330,000 tpy Quicklime Production Plant |
International Tender Document for
Lime & Dolo-lime Plant |
39 |
Aug 2014 |
Jahangir Gostar Alloy Saveh |
12,000 tpy FeSi75% Production Plant |
Basic & Detailed Engineering Services, Supervisory Services |
38 |
Mar 2014 |
Jahan Novin Aria |
H.C. FeCr Project |
Preliminary Evaluations & Studies –Phase 0 |
37 |
Oct 2013 |
Iran Ferroalloy Ind. |
Ferrosilicon Production Plant |
Engineering Services for Supply, Manufacturing, Erection & Commissioning of Continuous Casting Machine (Three Strand) |
36 |
Jul 2013 |
Iran Ferrosilice |
Modification of Furnace Shell & Refractories |
Basic & Detailed Engineering |
35 |
Apr 2013 |
Iran Ferroalloy Ind. |
Silicon Metal & Ferrosilicon Production Line |
Continuous Casting Machine + Mud gun / Drilling Machine |
34 |
Dec 2011 |
Asia Steel Metallurgy Ind. |
15,000 tpy FeMn Production Plant |
Complete Engineering Services for the whole Plant |
33 |
Apr 2010 |
Sabok Sazan Lowshan |
10,000 tpy Silicon Metal Production Plant |
Basic & Detail Eng. for Auxiliary Buildings |
32 |
Sep 2009 |
Sabok Sazan Lowshan |
10,000 tpy Silicon Metal Production Plant |
Engineering Services |
31 |
Jul 2009 |
Iran Ferroalloy Ind. |
Silicon Metal & Ferrosilicon Production Line |
Commissioning of Dedusting Plants of Furnaces 2&3 |
30 |
Oct 2007 |
Asia Steel Metallurgy Ind. |
HC FeMn Production Plant |
Basic Engineering Services |
29 |
Aug 2007 |
IMPASCO |
H.C. FeCr Production Plant |
Procurement of Soderberg Electrode |
28 |
Dec 2006 |
Asia Steel Metallurgy Ind. |
H.C. FeMn Project |
Preliminary Evaluations & Studies –Phase 0 |
27 |
May 2005 |
Mojtame Farayand Felez |
Aluminum Castings with Lost Foam Process |
Preparation of International Invitation To Bid (ITB) |
26 |
Mar 2005 |
IMPASCO |
20 MVA FeCr Plant |
Procurement & Supply of Plant Equipment |
25 |
Jun 2004 |
Iran Ferroalloy Ind. |
Silicon Metal & Ferrosilicon Production Lines |
Engineering Services (Basic Engineering & Detail Engineering) for the whole Plants |
24 |
Dec 2003 |
Iran Ferroalloy Ind. |
Filter Plant –Microsilica Production Line |
Bag House Filter Optimization by Utilizing Gore-Tex Filter Bags |
23 |
Dec 2002 |
IMPASCO |
20 MVA FeCr Plant |
EPC Contract for Water Treatment, Furnace Water Cooling System, Oxygen, Hydraulics & Utilities |
22 |
Nov 2002 |
SMS Demag |
39 MVA FeSi Furnace |
Basic & Detail Eng. for Raw Material Handling, Water Cooling System, Casting Equipment, Utility Systems, Furnace and Plant Electrical Systems |
21 |
Apr 2001 |
Sabzevar FeCr project |
20 MVA FeCr Plant |
Detail Engineering / Shop Drawing for Locally Manufactured Equipment |
20 |
Dec 2000 |
Sabzevar FeCr Project |
20 MVA FeCr Plant |
Engineering Services, Design of Plant (in Cooperation with Pyromet Co. -South Africa) |
19 |
May 2000 |
Navid Alyazh |
3.75 MVA FeCr Furnace |
Plant Refurbishment (Electrode Column, High Current Supply Lines & Furnace Lining Design) and Product Change-Over from FeSi to FeCr |
18 |
Sep 1999 |
Ministry of Mines & Metals |
4*25000 tpy FeCr Plants |
Negotiation with Foreign Investors (ABB) |
17 |
Sep 1999 |
Iran Roy-Gostar |
2 MVA zinc Furnace |
Process Optimization, Concentrate Treatment |
16 |
Jun 1999 |
Iran Roy-Gostar |
2 MVA zinc Furnace |
Furnace Lining Design and Plant Commissioning |
15 |
Apr 1999 |
Ehya Sanay-e Khorasan |
20000 tpy FeCr Project |
Technical, Economical Consultancy to Absorb Foreign Investors, Proposals Evaluation |
14 |
Feb 1999 |
Ministry of Mines & Metals |
FeSiAl Production from High Ash Refuse of Coal Washing Plants |
R&D Research, Process Description |
13 |
Dec 1998 |
Qeshm Metal Corp. |
20 MVA FeMn/SiMn Plant |
Design Appraisal, Design Modification, Supervision |
12 |
Nov 1998 |
Iran Ferroalloy Ind. |
52.8 MVA FeSi Furnace |
Design, Manufacture & Supply of Quartz Treatment Plant |
11 |
Apr 1998 |
Sabzevar FeCr Project |
20 MVA FeCr Plant |
Conceptual Design / Basic Engineering Services |
10 |
Mar 1998 |
Ehya Sanay-e Khorasan |
20000 tpy FeCr Project |
Preparation of International Invitation To Bid (ITB) |
9 |
Feb 1998 |
Iran Ferrosilice |
55.2 MVA FeSi Furnace |
Training of Key Personal, Furnace Optimization |
8 |
Nov 1997 |
Navid Alyazh |
3.75 MVA FeSi Furnace |
Design, Manufacture & Supply of Stoking Machine |
7 |
Jul 1997 |
Navid Alyazh |
3.75 MVA FeSi Furnace |
Process Optimization and Trouble Shooting |
6 |
Feb 1997 |
Iran Ferrosilice |
55.2 MVA FeSi Furnace |
Design Evaluation, Selection of Raw material, Quartz Mine Evaluation |
5 |
Jan 1997 |
Navid Alyazh |
3.75 MVA FeSi Furnace |
Training of Key Personal, Production Supervision |
4 |
Dec 1996 |
Iran Ferrosilice |
55.2 MVA FeSi Furnace |
SiC Removal with Wash-out Procedure |
3 |
Aug 1996 |
AlMahdi Aluminum |
Anode Making & Anode Rodding Plant |
Process Engineering Services |
2 |
Jul 1996 |
Navid Manganese |
13.2 MVA FeMn Furnace |
Design and Existing Equipment Evaluation, Process Technology of FeMn Production |
1 |
Jun 1996 |
Navid Alyazh |
3.75 MVA FeSi Furnace |
Plant Overhaul, Furnace Relining and Commissioning |